Browse Seattle permits

Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.

Clear

All permits

Updated 7 days ago

Recently changed status

Permits that moved between statuses during the latest ingests.

JSON
Ballard • residential • May 28, 2025
completed

Demolish one-family dwelling per plan.

Magnolia • residential • May 28, 2025
completed

Demolish residential structure and construct site work per plans

University District • commercial • May 28, 2025
completed

Construct alterations to restaurant (Agua Verde) at northeast corner of level 1 and 2 of existing commercial building per plan.

Belltown • commercial • May 28, 2025
completed

Construct alterations to existing human services tenant space (Sound Health Belltown) including work to interior tenant space parapets and some changes to entryway per plan.

Queen Anne • residential • May 27, 2025
active

Construct alterations to existing single family residence subject-to-field-inspection (STFI).

Queen Anne • residential • May 27, 2025
active

Construct non-structural interior alterations for dwelling unit at the 4th floor level of multi-family building [SIGNATURE PLACE CONDOMINIUM] subject to field inspection [STFI].

Capitol Hill • residential • May 27, 2025
completed

Construct alterations to single-family residence at front porch and on the interior subject to field inspection (STFI).

Central District • residential • May 27, 2025
completed

Construct substantial alterations to finish basement provide egress opening and revise kitchen and the bathrooms at both levels of existing single-family residence subject to field inspection.

Beacon Hill • residential • May 27, 2025
completed

Construct detached storage building accessory to existing single family residence

Northgate • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (James Baldwin ES) subject to field inspection (STFI)

Other Seattle • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Sandpoint ES) subject to field inspection (STFI)

West Seattle • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Pathfinder K-8) subject to field inspection (STFI)

Columbia City • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Hawthorne ES) subject to field inspection (STFI)

Beacon Hill • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Kimball ES) subject to field inspection (STFI)

Downtown • commercial • May 27, 2025
active

Construct interior alterations adding (36) phone booth pods (Flrs 8-14 17-28 34-37) of existing commercial building per plan

Central District • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Madrona ES) subject to field inspection (STFI)

Rainier Valley • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Martin Luther King Jr ES Brighton) subject to field inspection (STFI)

White Center • commercial • May 27, 2025
completed

Install card readers and electric locks on non-egress sides of doors in institutional building (Highland Park ES) subject to field inspection (STFI)

International District • commercial • May 27, 2025
active

Tenant improvement for remodel for general sales and service (lulu Mart) at ground floor of existing commercial building per plan. DONH-COA-01664 concurrent review

Rainier Valley • residential • May 27, 2025
completed

(Establish use as a detached accessory dwelling unit per the land use code.) Construct a one-family dwelling per Standard Plan 6880596-SP. Demolition of pool and detached garage included this permit.

Mt Baker • commercial • May 27, 2025
completed

Construct alterations to repair and restripe existing paved parking lot located offsite from main Franklin High School Campus. Work will include fence repair pedestrian gate and new powered vehicle gates per plan.

Wedgwood • residential • May 27, 2025
active

Construct additions & substantial alterations to one-family dwelling per plan

Beacon Hill • residential • May 27, 2025
completed

Establish use as a single-family residence per the land use code. Construct a one-family dwelling maintaining portions of foundation and structure per plans

Magnolia • residential • May 27, 2025
active

Establish use as single family residence with attached accessory dwelling unit per land use code. Construct new two family dwelling and site retaining walls per plan.

University District • residential • May 27, 2025
active

Convert existing house to a DADU (no construction) per plan (Establish use as a single-family residence and convert existing single family residence to a detached accessory dwelling unit per the land use code. Construct a one-family dwelling maintaining an existing adjacent dwelling per plan. Review and processing for two records under 7023021-CN.)

Beacon Hill • residential • May 26, 2025
completed

Allow new attached accessory dwelling unit to existing single family use per land use code. Construct alterations in basement for a two-family dwelling per plan.

Magnolia • residential • May 25, 2025
active

Establish use as single family residence per land use code. Construct new one family dwelling per plan.

Greenwood • residential • May 24, 2025
active

Construct alterations to rebuild southern entry porch and eastern upper floor deck of existing single-family residence per plan.

South Lake Union • commercial • May 23, 2025
completed

STFI Tenant improvement at 325 EASTLAKE AVE E to add full height demountable system furniture walls subject to field inspection STFI.

Meadowbrook • residential • May 23, 2025
completed

Construct alterations to basement of existing single family residence subject-to-field inspection (STFI).