Browse Seattle permits
Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.
All permits
Updated 9 days ago
Recently changed status
Permits that moved between statuses during the latest ingests.
Construct alterations to modify seating at northeast and southeast grandstand of commercial stadium building [LUMEN FIELD] per plan.
Construct substantial alterations & additions for single-family residence per plan.
Demolition of an existing single family residence Per Plan.
Construct substantial alterations and additions to existing one family dwelling per plan.
Construct alterations to existing two family dwelling at rooftop at Unit A per plan.
Foundation repair to include helical and driven piles for two-family dwelling per plan.
Construct two-family dwelling per plans. (Establish use as townhouses per Land Use Code. Construct a two-family dwelling and a three-unit townhouse. Reviews and processing for two construction records under 7002509-CN)
Construct one-family dwelling (SFR 1) per plans. (Establish use as single family residence per land use code. Construct 5 one-family dwellings. Reviews and processing for 5 construction records under 7020477-CN)
Construct one-family dwelling (SFR 5) per plans. (Establish use as single family residence per land use code. Construct 5 one-family dwellings. Reviews and processing for 5 construction records under 7020477-CN)
Construct one-family dwelling (SFR 2) per plans. (Establish use as single family residence per land use code. Construct 5 one-family dwellings. Reviews and processing for 5 construction records under 7020477-CN)
Construct one-family dwelling (SFR 3) per plans. (Establish use as single family residence per land use code. Construct 5 one-family dwellings. Reviews and processing for 5 construction records under 7020477-CN)
Construct one-family dwelling (SFR 4) per plans. (Establish use as single family residence per land use code. Construct 5 one-family dwellings. Reviews and processing for 5 construction records under 7020477-CN)
Construct non-structural alterations to convert unconditioned basement to living space for single-family residence subject to field inspection [STFI].
Construct alterations to existing one family dwelling subject to field inspection (STFI). Complete and final work begun under permit 6885039-CN.
Construct non-structural interior alterations for single-family residence subject to field inspection [STFI].
Construct interior alterations to upper level of SFR subject to field inspection STFI.
Construct patio addition to SFR subject to field inspection STFI.
Construct interior alterations to SFR subject to field inspection STFI.
Construct detached garage accessory to existing one-family dwelling subject to field inspection (STFI)
Construct seismic retrofit to existing single family residence per Prescriptive Earthquake Home Retrofit plan set.
Demolish existing one family dwelling per plan.
Construct blanket permit tenant improvements to ZGF Architects on the 24th floor of existing commercial building per plan.
Voluntary repair to existing foundation using three (3) helical piles.
Construct tenant improvements to existing commercial building at level 2 (Seattle Aquarium Pier 59) per plan.
Allow a detached accessory dwelling unit per the land use code. Construct a one-family dwelling per plans.
Construct retaining walls and pin pile foundation repair to existing one-family dwelling per plan
Construct new one-family dwelling per plan (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct new one- and two-family dwellings per plan. Review and processing for two records under 7027591-CN).
Construct new two-family dwelling per plan (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct new one- and two-family dwellings per plan. Review and processing for two records under 7027591-CN).
Construct west two-family dwelling per plan (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct new one and two family dwellings per plan. Review and processing for two records under 7020475-CN)
Construct east single-family dwelling per plan (Establish use as single-family residence per land use code. Construct 2 new one-family dwellings per plan.. Review and process for 2 records under 7020475-CN)
Construct addition to SFR subject to field inspection STFI.
Construct substantial alterations for existing one-family dwelling per plan
Construct crawlspace support repair (intellijack) to existing one family dwelling per plan.
Engineered Voluntary seismic retrofit to SFR STFI
Interior alterations to existing single family residence subject to field inspection STFI
Complete and Final for 6514543-CN subject to field inspection.
Tenant improvement to existing office space to extend full-height demountable partition walls subject to field inspection STFI
Interior alterations to existing single family residence subject to field inspection STFI
Tenant improvements on main floor for retail tenant (Sunstone) occupy per plan.
Construct interior alterations to SFR subject to field inspection STFI.
Allow a detached accessory dwelling unit per the land use code. Construct a one-family dwelling accessory to a single-family residence and demolish accessory structures per plans
Construct alterations to a minor telecommunications facility (AT&T) at the roof level of building per plans
Repair and replace water-damaged portions of units within south building [BUILDING 4 - ROSEMONT] of multi-family retirement complex [VILLAGE GREEN SENIOR LIVING WEST SEATTLE] floors 1-3 per plan.
Allow new attached accessory dwelling unit to existing single-family use per land use code.Construct additionas and alterations for a two-family dwelling per plan.
Construct alterations to existing tenant space at 2nd floor of existing mixed use building per plan.
Construct alterations at lower level offices in northeast building on institutional campus [CRISTO REY JESUIT SEATTLE HIGH SCHOOL] per plan.
Install attachment bolts to existing shelves in a commercial building per plan.
Replace 9 windows and 1 patio door like for like in existing single family residence subject to field inspection STFI.
Construct deck addition to SFR subject to field inspection STFI.
Roof damage repair after bomb cyclone tree fall incident with Code upgrades to existing attic framing subject to field inspection STFI.