Browse Seattle permits

Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.

Clear

All permits

Updated 12 days ago

Recently changed status

Permits that moved between statuses during the latest ingests.

JSON
Green Lake • commercial • Aug 27, 2024
completed

Change of use from office to medical services per land use code. Construct as interior non-structural tenant improvements to existing commercial building and occupy per plan.

South Lake Union • commercial • Aug 27, 2024
completed

Construct blanket permit tenant improvements to NeuroVeda on the first floor of existing commercial building per plan.

Phinney Ridge • residential • Aug 27, 2024
completed

Allow new detached accessory dwelling unit to existing single family use per land use code. Construct alterations for a two family dwelling per standard plan 6804831-SP.

Broadview • residential • Aug 27, 2024
completed

Substantial alterations to existing detached garage to convert to a one-family dwelling per plans. (Allow a detached accessory dwelling unit per Land Use Code. Construct additions and alterations to existing one-family dwelling and convert existing detached garage to a one-family dwelling. Reviews and processing for 2 construction records under 7021324-CN)

Broadview • residential • Aug 27, 2024
completed

Construct dining room and deck addition to one-family dwelling per plans. (Allow a detached accessory dwelling unit per Land Use Code. Construct additions and alterations to existing one-family dwelling and convert existing detached garage to a one-family dwelling. Reviews and processing for 2 construction records under 7021324-CN)

Ballard • residential • Aug 26, 2024
completed

Interior only tenant improvement within an existing five-unit apartment building; work area is contained within one unit - add one partition wall to create a bathroom; relocate kitchen

Capitol Hill • residential • Aug 26, 2024
completed

Construct interior non-structural alterations to convert 2nd floor closet 3/4 bath for single-family residence subject to field inspection [STFI].

Northgate • residential • Aug 26, 2024
completed

Construct an exterior deck accessory to a single-family residence per plans

Other Seattle • commercial • Aug 26, 2024
active

Temporary installation of additional antennae to existing minor telecommunication facility (T-Mobile) at Lumen Field annex building for a maximum of 18 months per plan.

South Lake Union • commercial • Aug 26, 2024
completed

Construct blanket permit tenant improvements to future tenant on the second floor of existing commercial building per plan.

Ravenna • residential • Aug 26, 2024
completed

Alterations to a single-family residence subject to field inspection.

Belltown • commercial • Aug 26, 2024
completed

Construct tenant improvement to existing mixed-use building at first floor (Houston's Hot Chicken) per plan. Mechanical included.

White Center • residential • Aug 23, 2024
completed

Interior alteration to basement level of existing single family residence subject to field inspection (STFI).

Columbia City • residential • Aug 23, 2024
completed

Demo one-family dwelling & detached accessory buildings per plan

Downtown • commercial • Aug 23, 2024
completed

Erect seasonal temporary structure for Nordstrom's Santa Lane Event for four weeks from Thanksgiving day through Christmas 2024. Separate Street Use Permit required.

West Seattle • residential • Aug 23, 2024
completed

Construct wood framed rooftop deck on a single-family residence per plan.

Capitol Hill • commercial • Aug 23, 2024
active

Construct alterations and voluntary seismic retrofit at basement level for institutional building [LAMBERT HOUSE] per plan.

Capitol Hill • commercial • Aug 23, 2024
completed

Construct tenant Improvements in existing mixed-use building for child daycare on 3rd floor for the Hatch School occupy per plan.

Eastlake • commercial • Aug 22, 2024
active

Install of mobile SL 250 stage with (2) truss towers for Audio Delays per plan (Temporary installation of mobile SL 250 stage with (2) truss towers for Audio Delays Two (2) 45'x45' shade structures and two (2) 20'x4'x16' Truss Arches for ANJUNA BEATS concert on August 24th; review and process for three records under 7040834-CN).

Bitter Lake • commercial • Aug 22, 2024
completed

Construct tenant improvements to include casework and finishes removal of existing diagnostic equipment and prep for new equipment (under separate permit) at main level simulator room of institutional building [PROTON THERAPY BUILDING FRED HUTCHINSON CANCER CENTER] subject to field inspection [STFI].

SoDo • commercial • Aug 22, 2024
completed

Construct interior non-structural alterations to convert two small training rooms into one training room for institutional building [KING CO METRO - ATLANTIC BASE] subject to field inspection [STFI].

Licton Springs • commercial • Aug 22, 2024
completed

Alterations to existing educational and administrative office building on level 1 (Diversity Inclusion and Equity Office) per plan. Mechanical included.

Greenwood • residential • Aug 22, 2024
completed

Allow new detached accessory dwelling unit to exiting single family use per land use code. Construct new north one-family dwelling and demo existing accessory structure per plan

Rainier Beach • residential • Aug 21, 2024
completed

Remove non-structural interior finishes in single-family residence to determine cause of structural failures and location water leaks subject to field inspection (STFI)

Crown Hill • residential • Aug 21, 2024
completed

Partial alteration to an existing SFR with a +176sf single-story addition on the south facade. PASV & ECA Exemption Required

Greenwood • residential • Aug 21, 2024
completed

Interior alterations to a single-family residence subject to field inspection.