Browse Seattle permits
Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.
All permits
Updated 12 days ago
Recently changed status
Permits that moved between statuses during the latest ingests.
Demolish SFR subject to field inspection.
Complete and final 6801899-CN subject to field inspection
Dormer addition to existing duplex subject to field inspection.
Addition to SFR subject to field inspection STFI.
Tenant improvement in existing commercial building (Paul Allen Institute) at level 6 per plan.
Construct alterations to convert existing garage to a bedroom and re-establish parking for Single family residence per STFI
Construct alterations to three upper floor bathrooms to remove fixtures and wall covering to studs and provide new finishes subject to field inspection (STFI)
Construct tenant improvements for lab (BioMed Reality) at 2nd floor Suite 260/270 of existing commercial building per plan.
Construct alterations (entry awning) to one family dwelling per plans
Allow new detached accessory dwelling unit to existing single family use per land use code. Construct new one family dwelling remove detached garage per plan.
Construct tenant improvements to office building's cafeterias on the 8th and 12th floors occupy per plans.
Construct soldier pile shoring wall on site for institutional building [DUWAMISH TRIBAL SERVICES LONGHOUSE] per plan.
Voluntary engineered seismic retrofit for SFR subject to field inspection STFI.
Interior alterations to bathroom in SFR subject to field inspection STFI.
Engineered Voluntary seismic retrofit to SFR STFI
Engineered Voluntary seismic retrofit to SFR STFI
Engineered Voluntary seismic retrofit to SFR STFI
Interior alterations to existing single family residence subject to field inspection (STFI)
Replace 5 windows like for like in SFR subject to field inspection STFI.
Construct alterations at main level living area and roof of single-family residence subject to field inspection [STFI].
Construct partition wall to enclose communication stair in a office building on the 21st floor per plan
(Establish use as attached accessory dwelling unit per land use code.) Construct alterations in basement of single-family residence per plan.
Erect temporary stage cover and scaffold at Lumen Field for Metallica Concert on Saturday August 31st per plans. All stage components are provided by stage company and assembled by professional crew. Owner responsible for integrity of structure.
Construct tenant improvements to existing hospital (UWMC NW B-wing Pharmacy) on level 1 level 2 and roof per plan. Mechanical Included.
Construct interior alterations to existing multifamily building per plan
Construct alterations at roof level of institutional building [UW MEDICAL CENTER] per plan.
Construct addition and alterations to existing one family dwelling per plan.
Partial change of use (No change of use previous use was for an Institution (private school: The Hatch School) and applicant is proposing a same Institution use (private school: French American School) per land use code.) in subsidized apartment building.Construct alterations to create a school in portion of existing building on third floor for French Immersion School and occupy per plan.
Partial voluntary seismic upgrade to existing URM commercial building (Fred Marino Building) at roof w/parapet bracing per plan
Interior alterations to SFR subject to field inspection STFI.
Construct alterations for a bathroom in the upper floor of existing single family residence per plan.
Emergency Repair Damage from car to Single family Residence per STFI
Construct non-structural alterations at basement and 1st floor level for single-family residence subject to field inspection [STFI].
Construct new deck in rear on existing single-family residence per STFI
Change of use from general retail sales to indoor participant sports per land use code. Construct initial tenant improvements on level 1 for fitness center occupy per plan.
Repair concrete exterior stem wall (vehicle strike event) for existing commercial building subject-to-field-inspection (STFI).
Allow new detached accessory dwelling unit accessory to existing single family use per land use code. Construct new one family dwelling per standard plan 6794017-SP. Work includes demolition of detached garage.
Construct alterations to existing one family dwelling per plan.
Allow new detached accessory dwelling unit to exiting single family use per land use code. Construct new one family dwelling per plan
Construct addition and alterations to existing single-family residence per plan.
Construct tenant improvements for office space on levels 32-33 of existing commercial structure per plan.
Construct addition and alterations to one-family dwelling per plan
Construct detached accessory workshop for single-family residence per plan.
Construct interior alterations to existing single family residence per STFI
Construct east one-family dwelling per plan. (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct new one- and two-family dwellings per plan. Review and processing for two records under 6991198-CN)
Demolish existing house. Subdivide the parcel into two lots and construct a new duplex and 4-plex.
Demolish existing fire damaged multifamily building per plan.
Demolish existing fire damaged multifamily building existing foundation to remain per plan.
Demolish existing multifamily building existing foundation to remain per plan.
Construct tenant improvements to existing commercial building per plan.