Browse Seattle permits
Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.
All permits
Updated 2 days ago
Recently changed status
Permits that moved between statuses during the latest ingests.
Replace 4 windows like for like in SFR subject to field inspection STFI.
Construct interior alterations to SFR subject to field inspection STFI.
Construct interior alterations to SFR subject to field inspection STFI.
Replace 5 windows and exterior siding to an multi-family structure subject to field inspection.
Construct minor non-structural alterations for suite 350 at Pacific Place subject to field inspection STFI.
Allow new detached accessory dwelling unit to existing single family use per land use code. Construct new 1-family dwelling per standard plan 6880596-SP.
Construct substantial alterations and upper level additions to existing 1-family dwelling per plan
Alterations to existing minor telecommunications facilities (AT&T) at ground level and at roof of multifamily building per plan.
Construct basement alterations to existing one family dwelling including lowering basement floor per plan.
Tenant improvement in existing mixed-used building at ground level (La Parisienne) occupy per plan.
Change of use from single family residence to detached accessory dwelling unit. (Establish use as a single family residence with detached accessory dwelling unit per land use code. Construct new one family dwelling per plan. Review and processing for two records under 7097614-CN)
Construct blanket permit tenant improvements to future tenant on the 16th floor of existing commercial building per plan.
Construct blanket permit tenant improvements to Holmes Weddle & Barcott on the fifth floor of existing commercial building per plan.
Construct tenant improvement for locker rooms (Kraken Iceplex) level 1 of existing commercial building per plan10601 5TH AVE NE
Construct alterations to existing one family dwelling per plan.
Construct WEST SFD/AADU per plan [Establish use as single-family dwelling unit (SFD) with attached and detached accessory-dwelling units (AADU and DADU) per land use code. Construct as WEST two-family and EAST one-family dwellings; review and process for two records under 7073376-CN].
Construct substantial alterations and additions for WEST one-family dwelling to include new detached accessory garage per plan. [Allow detached accessory dwelling unit [DADU] to existing single-family use per Land Use Code. Construct substantial alterations and additions for one-family dwelling to include new detached accessory garage and Construct one-family dwelling per plan. Review and processing for (2) construction records under 7026383-CN.]
Construct interior and exterior alterations for existing private school (Bush middle school) south building per plan. Mechanical included.
Change of use from general retail sales and services to restaurant per land use code. Construct initial tenant improvement for same on ground floor of a mixed-use building occupy per plans. Mechanical included this permit
Construct guardrail walking mats step overs and warning line on rooftop of a commercial building per plans
Construct grading and restoration on portion of city controlled natural area per plans
Construct alterations to existing single family residence subject-to-field inspection (STFI).
Construct alterations to existing one-family dwelling subject to field inspection (STFI).
Construct substantial alterations to existing single family residence subject-to-field inspection (STFI).
Construct interior alterations to SFR subject to field inspection STFI.
Construct alterations to kitchen of SFR subject to field inspection STFI.
Construct interior alterations to SFR subject to field inspection STFI.
Construct engineered voluntary seismic retrofit to SFR STFI
Construct interior alterations in one-family dwelling at kitchen and basement subject to field inspection (STFI)
Establish use as sales and service general per land use code. Tenant improvement for ground level tenant space [SUITE 122] in mixed-use commercial building occupy per plan.
Construct alterations and deck addition to existing one-family dwelling per plan
Construct substantial alterations to existing single family dwelling (includes removal of attached garage) per plan
Construct interior alterations on 2nd floor of one-family dwelling subject to field inspection (STFI)
Construct tenant improvements for office space at level 54 of existing commercial building occupy per plan
Construct addition and substantial alterations to existing one family dwelling per plan.
Construct new east two family dwelling per plan. (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct (2) new two family dwellings per plan. Review and processing for two records under 7073374-CN)
Construct new west two family dwelling per plan. (Establish use as townhouse per land use code. Construct (2) new two-family dwellings per plan. Review and processing for two records under 7073374-CN)
Construct alterations to Rm A226 A-Wing of existing institutional building (UW Medical Center) per plan. Mechanical included.
Construct alterations to existing multifamily building at the rooftop for minor telecommunications facility per plan.
Construct interior alterations to upper level of SFR subject to field inspection STFI.
Construct alterations to one-family dwelling subject to field inspection (STFI)
Replace one door in SFR like for like subject to field inspection STFI.
Construct an accessory structure accessory to existing single family residence subject-to-field inspection (STFI).
Interior alterations to existing single family residence subject to field inspection (STFI).
Construct tenant improvements to clinic subject to field inspection (STFI).
Construct alterations to existing single family residence subject-to-field-inspection (STFI).
Construct exterior deck addition to a single-family residence subject to field inspection (STFI)
Construct addition to west side and alterations to existing single family residence subject to field inspection (STFI)
Construct deck addition to SFR subject to field inspection STFI.
Demolish existing single family residence per plan.