Browse Seattle permits
Filter the live permit stream by neighborhood and permit type, then drill into the projects that matter to your team.
All permits
Updated 5 days ago
Recently changed status
Permits that moved between statuses during the latest ingests.
Replace and install new antennas to existing rooftop and on ground of existing minor communication utility (AT&T) per plan.
Construct seismic retrofit to existing single family residence per Earthquake Home Retrofit plan set.
Construct alterations to existing one family dwelling for new deck per plan.
Construct alterations to install bollards on site for commercial building [7-ELEVEN] per plan.
Construct repairs to existing residential pier per plan.
Construct alterations to repair portion of western exterior wall of existing church building per plan.
Construct interior alterations to SFR subject to field inspection STFI.
Change of use from retail to restaurant per the land use code. Construct initial tenant improvement for same occupy per plans
Construct alterations and additions for single-family residence per plan.
Construct alteration (enclose patio) to existing townhouse unit per plan
Construct alterations in existing mixed-use building (Harbor Steps NE Tower) to subdivide a tenant space at suite 100 per plan.
Construct interior alteration to existing one-family dwelling subject to field inspection.
Construct substantial alterations and additions to fire damaged single-family residence per plan.
Construct east one family dwelling per plan. (Establish use as single-family dwelling with detached accessory dwelling unit per land use code. Construct (2) one family dwelling per plan. Review and process for 2 records under 7065225-CN)
Construct west one family dwelling per plan. (Establish use as single-family dwelling with detached accessory dwelling unit per land use code. Construct (2) one family dwelling per plan. Review and process for 2 records under 7065225-CN)
Construct single family dwelling per plan. (Establish use as single family residence with attached and detached accessory dwelling units per land use code. Construct substantial alterations and addition to convert existing single family dwelling into two family dwelling and construct single family dwelling.)
Allow new detached accessory dwelling unit to existing single family use per land use code. Construct east one-family dwelling per standard plan 6804831-SP
Construct exterior alterations for mixed-use commercial building [BANK OF AMERICA] per plan.
Construct interior alterations to install patient lifts in ten (10) first floor patient rooms at Wash. St. DSHS Transitional Care Center (TCCS) subject to field inspection (STFI).
Construct exterior deck addition to a single-family residence subject to field inspection (STFI)
Construct alterations to one-family dwelling subject to field inspection (STFI)
Install card readers and electric locks on non-egress sides of doors in institutional building (Emerson ES) subject to field inspection (STFI)
Construct phone booths in existing office space subject to field inspection STFI.
Demolish a single-family residence and detached garage subject to field inspection.
Construct foundation alterations to existing one family dwelling per plan.
Construct alterations to add two (2) new Just Walk Out concessions stands on Club level of existing stadium (Lumen Field) per plan
Allow new detached accessory dwelling unit to existing single family use per land use code. Construct new one family dwelling per standard plan 7067317-SP.
Construct tenant improvements to existing North commercial building at level 5 per plan.
Construct dormer addition and alterations to a single-family residence per plans
Construct alterations for an emergency escape and rescue opening from the unheated basement level of a single-family residence per plans
Demolish existing one family dwelling per plan.
Establish use as single family residence with an attached accessory dwelling unit per land use code. Construct two family dwelling per plan.
Construct blanket permit tenant improvements to Boston Properties on the eighth floor of existing commercial building per plan.
Construct addition and alterations to existing one family dwelling per plan.
Construct west two family dwelling per plan. (Establish use as single-family dwelling with attached and detached accessory dwelling unit per land use code. Construct one and two family dwelling per plan. Review and process for 2 records under 7070544-CN)
Construct east one family dwelling per plan. (Establish use as single-family dwelling with attached and detached accessory dwelling unit per land use code. Construct one and two family dwelling per plan. Review and process for 2 records under 7070544-CN)
Construct addition and substantial alterations to existing one family dwelling per plan.
Construct addition and substantial alterations to existing one family dwelling per plan. Remove existing shed.
Construct alterations to one-family dwelling subject to field inspection (STFI)
Alterations to create half of a shared garage to a single-family residence subject to field inspection.
Alterations to create half of a shared garage to a single-family residence subject to field inspection.
Construct alterations to existing single family residence subject-to-field-inspection (STFI).
Construct alterations to replace skylights in existing Commercial building. per STFI
Construct interior non-structural alterations to administrative spaces within existing Seattle Yacht Club subject to field inspection STFI
Construct alterations throughout south dwelling unit in existing two-family dwelling subject to field inspection (STFI)
Erect temporary tent at Seattle University Soccer Field for periodic use for up to 6 months from 8/9/2025 per plans. All tent components are provided and assembled by professional crew. Owner responsible for structural integrity of tent.
Construct tenant improvements for storage (Lifelong) in center of Building D of existing mixed use building per plan.
Construct fire damage repairs to existing single-family residence subject to field inspection (STFI)
Demolish residential structures per plan
We are constructing a temporary structure on the EX floor of the Seattle Convention Center - Summit Building. This structure will be in use from 9/16/2025 through 9/19/2025. This is a private event for Amazon. The structure is manufactured steel deck with faux cladding applied.